SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Details:

Passing ScoreE_S4HCON2022 - 65%
E_S4HCON2020 - 68%
Duration90 mins
Reference BooksADM328, ADM328 (SAP S/4HANA 2020)
Exam NameSAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Number of Questions40
LevelAssociate
Sample QuestionsSAP S/4HANA Conversion and SAP System Upgrade Certification Sample Questions
Schedule ExamSAP Training
Exam Price$550 (USD)
Exam CodeE_S4HCON2022


SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
SUM Prepare PartPerform the SUM prepare part

ADM328

> 12%
Handling of an SAP System LandscapeDescribe the handling of the SAP system landscape during SAP S/4HANA conversion and SAP system upgrade

ADM328

8% - 12%
DowntimeDescribe the factors influencing downtime and techniques to reduce downtime

ADM328

8% - 12%
SUM Execution PartPerform the SUM execution part, including DMO

ADM328

> 12%
SUM Monitoring and TroubleshootingMonitor and troubleshoot the SUM procedure

ADM328

8% - 12%
SAP S/4HANA Conversion Prepare PhaseDescribe and perform the actions necessary during the SAP S/4HANA conversion prepare phase

ADM328

> 12%
Manual Activities for SUMDescribe the necessary manual preparation and follow-on activities for SUM

ADM328

8% - 12%
Modification AdjustmentPerform the modification adjustment with SPDD and SPAU

ADM328

8% - 12%

 

NEW QUESTION 31
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • B. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • C. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • D. After the SUM roadmap step "Execution" is finished and before "Postprocessing"

Answer: B

 

NEW QUESTION 32
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. Before the downtime starts
  • B. As part of the cleanup process
  • C. Early in the downtime
  • D. At the end of the downtime

Answer: A

 

NEW QUESTION 33
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The Application Guide
  • C. The DMO Guide
  • D. The SAP S/HANA Conversion Guide

Answer: C,D

 

NEW QUESTION 34
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The repetition option allows you to repeat the complete migration
  • B. The benchmaking option allows you to migration a specified set of tables
  • C. The repetition option allows you to run the migration without a shadow system
  • D. The benchmaking option allows you to repeat the uptime migration

Answer: B

 

NEW QUESTION 35
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. Dedicated application tables are migrated in uptime
  • B. TABIMJJPG is executed in uptime
  • C. An additional temporary database is used during uptime
  • D. The repository is migrated in uptime

Answer: A

 

NEW QUESTION 36
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:

  • A. Check the dump size of the database export on disk
  • B. Check the "Charts Control Center" in the SUM UI
  • C. Check the log files written under "SUM\abap\log"
  • D. Check logs for jobs starting with "RSUPG_SGEN" in the system

Answer: B,C

 

NEW QUESTION 37
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. Stack XML file calculated by the Maintenance Planner
  • B. Parameter file SAPup_add.par
  • C. Breakpoint configuration file SAPUPPHAS.BRK
  • D. MIGRATE J5T_DUR_XML file from a previous run

Answer: A,D

 

NEW QUESTION 38
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

Answer: A

 

NEW QUESTION 39
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Database migration
  • B. Homogenous system copy
  • C. Dual Stack split
  • D. Support Package Stack update
  • E. Release upgrade

Answer: A,D,E

 

NEW QUESTION 40
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SUM with DMO
  • C. SWPM using the Backup / Restore procedure
  • D. SWPM using the Load procedure

Answer: D

 

NEW QUESTION 41
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the database migration option (DMO) for SUM
  • B. Using the main configuration option "Single System" when installing an Add-On
  • C. Using the main configuration option "Single System" in case of an upgrade.
  • D. Using the main configuration option "Standard" when applying SAP Support Packages

Answer: B

 

NEW QUESTION 42
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. AA
  • B. The corrections to the SUM Guide
  • C. An overview about possible upgrade paths
  • D. The link to different patch levels to SUM

Answer: B,C,D

 

NEW QUESTION 43
ICNV initialization does 3

  • A. AA
  • B. Creation of flag
  • C. Creation of views
  • D. Build index on flag column

Answer: B,C,D

 

NEW QUESTION 44
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SYCM (Simplification Database Content)
  • B. ATC (ABAP Test Cockpit)
  • C. SAT (Runtime Analysis)
  • D. SE80 (Object Navigator)

Answer: B,D

 

NEW QUESTION 45
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • B. Import of upgrade and language data from the download directory in phase TABIM UPG
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • E. Import of dictionary objects from the download directory in phase DDIC_UPG

Answer: B,C,E

 

NEW QUESTION 46
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Download it from SAP Support Portal
  • B. Generate it by analyzing the specific custom code via RFC
  • C. Apply the corresponding SAP note via SAP Note Assistant
  • D. Configure it within transaction ATC

Answer: A

 

NEW QUESTION 47
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Create "modified* versions of the objects that you need to adjust
  • B. Assign the transport request as a modification adjustment transport
  • C. Release the transport request containing the modification adjustment
  • D. Manually activate the adjusted dictionary objects

Answer: A,B

 

NEW QUESTION 48
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To auto-fill specific fields on selected screens on the SUM UI
  • B. To skip selected phases during the SUM run
  • C. To make the progress information within SUM UI more accurate
  • D. To repeat specific phases during the SUM run

Answer: C

 

NEW QUESTION 49
In ICNV. How database operations synchronized between the source and the target table?

  • A. AA
  • B. Deletes are directly executed in the target table by delete trigger.

Answer: B

 

NEW QUESTION 50
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. SAP S/4HANA conversion to SAP S/4HANA 1709
  • B. Upgrading to SAP ECC 6.08 without using DMO
  • C. Using DMO when applying Support Packages to SAP ECC 6.07
  • D. Updating to SAP ECC 6.07 using DMO

Answer: A,B

 

NEW QUESTION 51
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Answer: B

 

NEW QUESTION 52
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Use DMO for SUM.
  • B. Apply an Enhancement Package.
  • C. Apply SAP Support Packages.
  • D. Perform an SAP S/4HANA conversion including DMO.
  • E. Upgrade the SAP system.

Answer: B,C,E

 

NEW QUESTION 53
......