DumpsFree provides high-quality dumps PDF & dumps VCE for candidates who are willing to pass exams and get certifications soon. We provide dumps free download before purchasing dumps VCE. 100% pass exam!

First Attempt Guaranteed Success in E_S4HCON2022 Exam 2023 [Q21-Q45]

Share

First Attempt Guaranteed Success in E_S4HCON2022 Exam 2023

Real E_S4HCON2022 Exam Questions are the Best Preparation Material

NEW QUESTION # 21
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Conversion of application tables (PARCONVJJPG)
  • B. Modification adjustment (SPDD)
  • C. Switch to new repository (EU_SWITCH)
  • D. Activation of dictionary objects (ACT_UPG)

Answer: B,D


NEW QUESTION # 22
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Run the database migration to the SAP HANA database
  • B. Perform the migration of data into the new data structure
  • C. Apply the recommendations of the simplification list
  • D. Check the compatibility of custom code with SAP S/4HANA

Answer: C,D


NEW QUESTION # 23
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Standalone AS ABAP with SAP_BASIS 752 and above
  • B. SAP S/4HANA Server 1809 and above
  • C. SAP ECC system from SAP ERP 6.0 EHP 8
  • D. SAP Solution Manager 7.2

Answer: A,B


NEW QUESTION # 24
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. SAP S/4HANA conversion to SAP S/4HANA 1709
  • B. Upgrading to SAP ECC 6.08 without using DMO
  • C. Updating to SAP ECC 6.07 using DMO
  • D. Using DMO when applying Support Packages to SAP ECC 6.07

Answer: A,B


NEW QUESTION # 25
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Unicode conversion
  • B. Software update
  • C. Database migration
  • D. Custom code analysis

Answer: B,C


NEW QUESTION # 26
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. AA
  • B. An overview about possible upgrade paths
  • C. The corrections to the SUM Guide
  • D. The link to different patch levels to SUM

Answer: B,C,D


NEW QUESTION # 27
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:

  • A. Move the SAPM update archive into the download folder
  • B. Extract the SAP HANA client installation archive
  • C. Move the R3trans update archive into the download folder
  • D. Extract the SAP HANA database installation archive
  • E. Move the stack.xml update file into the download folder

Answer: A,B,E


NEW QUESTION # 28
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the database migration option (DMO) for SUM
  • B. Using the main configuration option "Single System" when installing an Add-On
  • C. Using the main configuration option "Standard" when applying SAP Support Packages
  • D. Using the main configuration option "Single System" in case of an upgrade.

Answer: B


NEW QUESTION # 29
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the SUM technical downtime
  • B. After SUM has ended
  • C. During the Execution roadmap step
  • D. Before the start of the SUM technical downtime

Answer: A


NEW QUESTION # 30
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for source release, Windows, SAP MaxDB
  • B. Kernel for target release, Windows, SAP MaxDB
  • C. Kernel for target release, Windows, SAP HANA
  • D. Kernel for target release, Linux, SAP HANA

Answer: A,C


NEW QUESTION # 31
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • B. The source system is non-Unicode and the target database is a scale-out system.
  • C. The target database size increases temporarily because of the Shadow Repository.
  • D. Network capacity between exporting and importing R3load processes must be.
  • E. SAP HANA Landscape Reorganization required a manual step to edit a file.

Answer: A,E


NEW QUESTION # 32
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

  • A. PARMVNT_UPG
  • B. TABIMJJPG
  • C. TABIM_SHADOW_*
  • D. PARDIST_SHD

Answer: B


NEW QUESTION # 33
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • D. You need to build up a SI check framework by applying SAP notes.

Answer: A,D


NEW QUESTION # 34
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To skip selected phases during the SUM run
  • B. To auto-fill specific fields on selected screens on the SUM UI
  • C. To make the progress information within SUM UI more accurate
  • D. To repeat specific phases during the SUM run

Answer: C


NEW QUESTION # 35
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Apply SAP Support Packages.
  • C. Upgrade the SAP system.
  • D. Apply an Enhancement Package.
  • E. Use DMO for SUM.

Answer: B,C,D


NEW QUESTION # 36
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • C. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • D. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

Answer: B


NEW QUESTION # 37
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Uninstall Fiori apps not released for SAP_UI 7.50
  • B. Uninstall industry extensions not supported by SAP S/4HANA
  • C. Delete client 066 (Early Watch Client)
  • D. Install add-on SAP Gateway 7.50

Answer: A,C


NEW QUESTION # 38
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion SAP S/4HANA conversion without database migration Database migration
  • B. Unicode conversion SAP S/4HANA conversion including database migration
  • C. SAP S/4HANA conversion including database migration and Unicode conversion
  • D. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • E. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

Answer: B,D,E


NEW QUESTION # 39
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored in file sumabap conf during registration
  • B. The path was stored to the environment of user <sid>adm during registration
  • C. The path is taken from the URL entered in the browser to start SUM
  • D. The path was stored in file host_profile during registration

Answer: A


NEW QUESTION # 40
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. Dedicated application tables are migrated in uptime
  • B. The repository is migrated in uptime
  • C. TABIMJJPG is executed in uptime
  • D. An additional temporary database is used during uptime

Answer: A


NEW QUESTION # 41
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
  • B. The SAP support packages in the download directory that are newer than the selected support package stack
  • C. The SAP support packages that will be bound to the conversion
  • D. The SAP support packages of the support package stack, calculated by the maintenance planner

Answer: B


NEW QUESTION # 42
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • C. In the job log for the corresponding job in SM37 (Job Overview)
  • D. In the corresponding R3trans log files of this phase

Answer: B,C


NEW QUESTION # 43
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It is a database-specific document.
  • B. It explains where to find information about the custom code analysis.
  • C. It contains a section about the simplification item (SI) checks.
  • D. It explains the database migration option (DMO) of SUM.

Answer: B,C


NEW QUESTION # 44
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

  • A. Check the log files written in the SUM directory subdirectory abap. subdirectory log
  • B. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
  • C. Check the dump size of the database export on disk.
  • D. Check the Charts Control Center in the SUM Ul

Answer: A,C


NEW QUESTION # 45
......


SAP E-S4HCON2022 certification exam is designed for professionals who specialize in the technology aspects of SAP S/4HANA conversion and SAP system upgrades. E_S4HCON2022 exam is intended to test the candidate's knowledge and skills in converting traditional SAP systems to SAP S/4HANA, upgrading existing SAP systems, and managing the technical aspects of SAP S/4HANA.

 

Practice LATEST E_S4HCON2022 Exam Updated 75 Questions: https://www.dumpsfree.com/E_S4HCON2022-valid-exam.html