NEW QUESTION 12
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To repeat specific phases during the SUM run
- B. To auto-fill specific fields on selected screens on the SUM UI
- C. To skip selected phases during the SUM run
- D. To make the progress information within SUM UI more accurate
Answer: D
NEW QUESTION 13
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SWPM using the Load procedure
- B. SWPM using the Backup / Restore procedure
- C. SUM with DMO
- D. SUM without DMO
Answer: A
NEW QUESTION 14
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the messages shown by the SUM UI
- B. Check the system log (transaction SM21) of the SAP system
- C. Check the most recent entries shown in file sapevt.trc
- D. Check the most recent entries in SAPup.log
Answer: A,D
NEW QUESTION 15
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Using DMO when applying Support Packages to SAP ECC 6.07
- B. SAP S/4HANA conversion to SAP S/4HANA 1709
- C. Updating to SAP ECC 6.07 using DMO
- D. Upgrading to SAP ECC 6.08 without using DMO
Answer: B,D
NEW QUESTION 16
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.
- A. SAP HANA Landscape Reorganization required a manual step to edit a file.
- B. Network capacity between exporting and importing R3load processes must be.
- C. The target database size increases temporarily because of the Shadow Repository.
- D. The source system is non-Unicode and the target database is a scale-out system.
- E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
Answer: A,E
NEW QUESTION 17
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Shadow repository creation (EU_IMPORT*)
- B. Uptime migration (EU_CLONE_MIG_UT_RUN)
- C. ParaUel distribution (PARDIST_SHD)
- D. Downtime migration (EU_CLONE_MIG_DT_RUN)
Answer: B
NEW QUESTION 18
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- B. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- C. The upgrade of the PRD must be finished before you start new development in the DEV.
- D. The transport between Unicode and non-Unicode systems is forbidden.
Answer: B
NEW QUESTION 19
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Before the downtime starts
- B. Early in the downtime
- C. As part of the cleanup process
- D. At the end of the downtime
Answer: A
NEW QUESTION 20
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- C. You need to build up a SI check framework by applying SAP notes.
- D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
Answer: A,C
NEW QUESTION 21
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Execution of eCATTs for business validation tests
- B. Execution of SPDD modification adjustment
- C. Creation of the table structures in the new SAP HANA database
- D. Execution of XPRAs and AIMs
- E. Execution of SPAU modification adjustment
Answer: A,D,E
NEW QUESTION 22
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phase RUN_RSDBSCPY
- B. Phases EU_IMPORT*
- C. Phases DIFF*
- D. Phase DOWNCONF_DTTRANS
- E. Phase RUN_RSPTBFIL _ISUTABU
Answer: B,C,D
NEW QUESTION 23
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests that are assigned to the project SAP_ADJUST
- B. By searching for transport requests named <SID>K0<number>
- C. By searching for transport requests in the file umodauto.Ist
- D. By searching for transport requests in DIR_TRANS, subdirectory "transport"
Answer: C
NEW QUESTION 24
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:
- A. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- B. Check for running R3trans processes on the host of the primary application server
- C. Check for running batch jobs in the shadow system via Job Overview (SM37)
- D. Check for running R31oad processes on the host of the primary application server
Answer: A,B
NEW QUESTION 25
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the main configuration option "Single System" in case of an upgrade.
- B. Using the database migration option (DMO) for SUM
- C. Using the main configuration option "Standard" when applying SAP Support Packages
- D. Using the main configuration option "Single System" when installing an Add-On
Answer: D
NEW QUESTION 26
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Activation of dictionary objects (ACT_UPG)
- B. Modification adjustment (SPDD)
- C. Conversion of application tables (PARCONVJJPG)
- D. Switch to new repository (EU_SWITCH)
Answer: A,B
NEW QUESTION 27
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. AA
- B. The link to different patch levels to SUM
- C. An overview about possible upgrade paths
- D. The corrections to the SUM Guide
Answer: B,C,D
NEW QUESTION 28
......
SAP E_S4HCON2022 Exam Description:
The "SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade" certification exam validates that the candidate possesses the required level of knowledge to perform a technical SAP S/4HANA conversion and an SAP system upgrade. This certification proves that the candidate has an overall understanding and the inādepth technical skills required. Armed with an understanding of SAP system administration, the candidate can implement this knowledge practically in SAP projects. The enablement for this exam is being provided by the course "ADM328 - SAP S/4HANA Conversion and SAP System Upgrade". It is highly recommended that you have passed the exam C_TADM55_74 or C_TADM55_75 or C_TADM55A_75 prior to taking this exam.
Feel SAP E_S4HCON2022 Dumps PDF Will likely be The best Option: https://www.dumpsfree.com/E_S4HCON2022-valid-exam.html