NEW QUESTION # 64
True or False: When using Scrum with Kanban you can release multiple times during the Sprint.
- A. False
- B. True
Answer: B
NEW QUESTION # 65
True or False: The WIP Limit can only be changed during the Sprint Retrospective.
- A. True
- B. False
Answer: B
NEW QUESTION # 66
The Scrum Team's Definition of Workflow includes descriptions of each state of a work item can be. True or False: The various states of a work item described in the Definition of Workflow can only encompass flow inside of the Sprint. ie limited to the state of each column on the Developers' Kanban board.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 67
True or False: The way the Developers approach the Sprint Goal at the Daily Scrum changes if they are using Kanban. Choose only ONE best answer.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 68
A Scrum Team, that is new to Kanban, asks for your advise on how to start with increasing predictability.
What would be the most appropriate response? (choose the best answer)
- A. Setup a Kanban board for them to visualize the workflow.
- B. Have the team create a CFD, Control Chart and Aging chart to improve transparency.
- C. Ask the team to begin inspecting and adapting the Product Backlog during the Sprint Review.
- D. Teach them about Work in Progress (WIP) Limits and have them reduce the amount of work in progress.
Answer: D
NEW QUESTION # 69
Which is the most appropriate metric to look at if you want to determine when an item that that has NOT started might be finished?
- A. Team Velocity.
- B. Team Capacity.
- C. Historical Cycle Times.
- D. There is no such metric.
- E. Work Item Age.
Answer: C
NEW QUESTION # 70
In the context of Kanban, which statement best describes flow? (choose the best answer)
- A. The movement of tasks between workflow stages.
- B. The movement of customer value throughout the product development system.
- C. An undesirable effect of too much work being present in the system.
- D. A software development technique.
Answer: B
NEW QUESTION # 71
True or False: Cycle time is considered a lagging indicator.
- A. TRUE
- B. FALSE
Answer: A
NEW QUESTION # 72
True or False: The Sprint length can be thought of as the team's batch size with Scrum Teams using Kanban.
- A. Choose only ONE best answer.
- B. FALSE
- C. TRUE
Answer: B
NEW QUESTION # 73
True or False: Releases are limited to the end of the Sprint cycle when Scrum Teams use Kanban.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 74
True or False: The level of collaboration within a Scrum Team will likely reduce when applying Work in Progress (WIP) Limits.
- A. FALSE
- B. TRUE
Answer: A
NEW QUESTION # 75
True or False: In a flow-based system, the number of tasks is not necessarily limited, rather the amount of value-generating work items is limited.
- A. False
- B. True
Answer: B
NEW QUESTION # 76
A Cycle Time Scatterplot can help you visualize: (choose the best answer)
- A. Individual Cycle Time outliers.
- B. General Cycle Time trends.
- C. Groups of Cycle Time outliers.
- D. All of the answers.
Answer: D
NEW QUESTION # 77
What can happen if the Scrum Team's Work In Progress (WIP) Limit is not honored? (choose the best answer)
- A. Processes will suffer from inefficiency.
- B. Feedback loops become shorter.
- C. Team throughput increases.
- D. Concurrent operations will slow down.
Answer: A
NEW QUESTION # 78
True or False: Kanban in a Scrum context does not require any additional events to those outlined in the Scrum Guide.
- A. TRUE
- B. FALSE
Answer: A
NEW QUESTION # 79
Which is the most appropriate metric to look at if you want to determine when an item that has already started is going to finish?
- A. Team Velocity.
- B. Cycle Time.
- C. Team Capacity.
- D. Lead Time.
- E. Work Item Age.
Answer: E
NEW QUESTION # 80
Which of the following best describes Kanban? (choose the best answer)
- A. Additional practices that are integrated into the Scrum framework.
- B. A strategy for optimizing the flow of value through a process that uses a visual, Work in Progress (WIP) limited pull system.
- C. A process of defining a Scrum Team's workflow in order to increase productivity.
- D. None of the above.
Answer: B
NEW QUESTION # 81
......
Get ready to pass the PSK-I Exam right now using our Professional Scrum with Kanban Exam Package: https://www.dumpsfree.com/PSK-I-valid-exam.html
A fully updated 2023 PSK-I Exam Dumps exam guide from training expert DumpsFree: https://drive.google.com/open?id=1ROCeVBA9R39jDvMNgDZx_M4rACnnlV9M