NEW QUESTION # 25
How are waves created? Note: There are 2 correct answers to this question.
- A. Automatically when a warehouse task is created
- B. Automatically when a production material request is created
- C. Automatically when an outbound delivery order is created
- D. Manually during planning in the shipping cockpit
Answer: C,D
NEW QUESTION # 26
When creating new document types, what must you keep in mind about system profiles?
- A. That you have to define your own profiles for your specific processes
- B. That the profiles are predefined and not changeable
- C. That you should use the profiles created by Business Configuration Sets (BC Sets)
- D. That the profiles have to be assigned to your new document type
Answer: B
NEW QUESTION # 27
When you create a direct outbound delivery order, where can availability checks happen? Note: There are 2 correct answers to this question.
- A. In SAP APO
- B. In SAP TM
- C. In SAP CRM
- D. In SAP EWM
Answer: A,D
NEW QUESTION # 28
Which of the following can you include in a storage type search sequence for stock removal? Note: There are
2 correct answers to this question.
- A. A list of storage type groups
- B. A list of storage bin types
- C. A list of storage types
- D. A list of storage sections
Answer: B,D
NEW QUESTION # 29
What is the default requirement for an asynchronous goods receipt process in SAP Extended Warehouse Management?
- A. A purchase order
- B. An inbound delivery
- C. An expected goods receipt
- D. A door assignment
Answer: B
NEW QUESTION # 30
Which of the following actions are possible based on a value-added service (VAS) order? Note: There are
3 correct answers to this question.
- A. Capture costs.
- B. Capture time required.
- C. Consume auxiliary products.
- D. Assemble a kit.
- E. Perform quality inspection.
Answer: B,C,D
NEW QUESTION # 31
Which stocks can be displayed in the SAP Extended Warehouse Management warehouse management monitor? Note: There are 2 correct answers to this question.
- A. Stock in transportation units
- B. Stock in transit
- C. Stock at third party
- D. Stock on resources
Answer: A,D
NEW QUESTION # 32
Which options are available in the packing profile that is assigned to the warehouse order creation rule?
Note: There are 3 correct answers to this question.
- A. Use a simple algorithm, a complex algorithm, or a BAdI.
- B. Skip a warehouse task that no longer fits into the pick handling unit.
- C. Consider length, width, and height.
- D. Create items in the outbound delivery for the packaging material.
- E. Limit the number of items to be packed in the pick handling unit.
Answer: A,B,C
NEW QUESTION # 33
An exception code can be triggered by the system or entered by a user. What must you assign to a customer-specific exception code?
- A. A business context
- B. An internal exception code
- C. A workflow as follow-on action
- D. A process step
Answer: B
NEW QUESTION # 34
Your customer wants to implement the material flow system (MFS) to control conveyors and the automated high rack storage area. How do you connect SAP Extended Warehouse Management to communicate with the programmable logic controllers (PLC)? Note: There are 2 correct answers to this question.
- A. Directly integrate to the PLC using ABAP Push Channels.
- B. Use an RFC adapter to connect with the TCP/IP socket server of the PLC.
- C. Activate the link to the subsystems using the ALE interface on the warehouse number.
- D. Send an IDoc through a Post Processing Framework action to the PLC.
Answer: B,C
NEW QUESTION # 35
What do you need to configure before you can create warehouse tasks for an outbound delivery order or an inbound delivery? Note: There are 2 correct answers to this question.
- A. Putaway control indicator or stock removal control indicator
- B. Warehouse process types
- C. Warehouse process type determination
- D. Warehouse order creation rules
Answer: B,C
NEW QUESTION # 36
For a picking task, the system must determine the storage types from which to remove the stock. How does the system find the storage type search sequence?
- A. The system attempts to read the combination of warehouse number, stock removal indicator, stock type, and warehouse process type, then it only uses the warehouse number.
- B. The system attempts to use the defined access strategy, then it uses the combination of warehouse number, stock removal indicator, and warehouse process type.
- C. The system attempts to read a completely qualified entry, with all parameters and indicators, then it uses the defined access strategy.
- D. The system attempts to read the combination of warehouse number and stock removal indicator, then it uses the combination of warehouse number and warehouse process type.
Answer: A
NEW QUESTION # 37
What do you use to control what is displayed on the mobile device? Note: There are 2 correct answers to this question.
- A. Personalization profile
- B. Queue type
- C. User profile
- D. Presentation profile
Answer: A,D
NEW QUESTION # 38
Your customer has two warehouse numbers that share the same physical yard. How do you set up the yard to enable yard management?
- A. Define a storage type for a yard in both warehouse numbers, and connect the two storage types with a common checkpoint.
- B. Define a storage type for a yard in each warehouse number without any other settings.
- C. Define a storage type for a yard in one of the warehouse numbers, and connect the yard with doors to the other warehouse number.
- D. Define a storage type for a yard in each warehouse number, and connect the two storage types with doors to each other.
Answer: C
NEW QUESTION # 39
For what type do you define the replenishment method?
- A. Document type
- B. Warehouse process type
- C. Material type
- D. Storage type
Answer: D
NEW QUESTION # 40
Which structural objects do you have to maintain to integrate SAP Dock Appointment Scheduling into SAP EWM? Note: There are 2 correct answers to this question.
- A. Loading points
- B. Staging areas
- C. Yards
- D. Docking locations
Answer: A,D
NEW QUESTION # 41
Which standard functions can be executed in the background when you enter an exception code in a radio frequency (RF) transaction? Note: There are 3 correct answers to this question.
- A. Generate workflow process
- B. Cancel physical inventory document
- C. Confirm warehouse order
- D. Block a bin
- E. Create bin replenishment
Answer: A,D,E
NEW QUESTION # 42
How can you determine the labor activities to calculate the planned duration for activities in the warehouse? Note: There are 2 correct answers to this question.
- A. Directly
- B. Using a decision service in BRFplus
- C. Using a work step sequence
- D. As a standard step
Answer: A,B
NEW QUESTION # 43
How can you configure the storage of products in a temperature-controlled area of a warehouse? Note:
There are 3 correct answers to this question.
- A. Configure a material staging area.
- B. Create a new storage bin type.
- C. Create a new storage type.
- D. Configure a storage type search sequence.
- E. Create a new putaway control indicator.
Answer: C,D,E
NEW QUESTION # 44
Which distribution methods can you use to replicate delivery documents from an SAP ERP system to SAP Extended Warehouse Management? Note: There are 2 correct answers to this question.
- A. Core Interface (CIF) distribution model
- B. Distribution via Post Processing Framework (PPF) actions
- C. Immediate distribution at document creation
- D. Manual distribution
Answer: C,D
NEW QUESTION # 45
What does SAP recommend for the distribution of master data information via IDoc in a system landscape with a decentralized EWM based on SAP S/4HANA?
- A. Define reduced message types for materials, customer, and vendors.
- B. Define a distribution model with the Core Interface (CIF).
- C. Distribute plants and shipping points separately.
- D. Use existing message types (like MATMAS, DEBMAS).
Answer: B
NEW QUESTION # 46
Which of the following are outbound process steps? Note: There are 2 correct answers to this question.
- A. Quality inspection
- B. Remove from stock
- C. Value-added services
- D. Putaway
Answer: B,C
NEW QUESTION # 47
How can you determine the labor activities to calculate the planned duration for activities in the warehouse?
Note: There are 2 correct answers to this question.
- A. Directly
- B. Using a decision service in BRFplus
- C. Using a work step sequence
- D. As a standard step
Answer: A,B
NEW QUESTION # 48
Which of the following is a prerequisite for assigning a warehouse order to a resource automatically?
- A. The creation of a pick-handling unit must be done automatically with a packaging specification.
- B. The resource group of the resource must be assigned to the warehouse order creation rule.
- C. The warehouse order must be picked from the same activity area that is assigned to the resource.
- D. The warehouse order must be in a queue that is assigned to the resource either directly or through a resource group.
Answer: C
NEW QUESTION # 49
......