NEW QUESTION # 43
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?

  • A. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
  • B. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
  • C. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
  • D. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator

Answer: C


NEW QUESTION # 44
The MRP run detected a shortage of a materila that you sorce from an external supplier in full pallets. How can you make sure you will only recive full pallets?

  • A. Use the minimum order quantity
  • B. Use the MRP type for vendor managed inventory.
  • C. Use the reorder point
  • D. Use the fixed lot procedure.

Answer: D


NEW QUESTION # 45
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Run MRP with quota arrangement.
  • B. Assign planned orders manual lying the planning table.
  • C. Run PP/DS heuristics for repetitive manufacturing.
  • D. Run MRP with automatic selection of production version.

Answer: A,C


NEW QUESTION # 46
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

  • A. Model a seperate resource in the production data structure.
  • B. Model a resource inbound in the location master.
  • C. Model a transportation resorce in the location master.
  • D. Model a handling resource in the location master and goods receipt time in the material master.

Answer: C,D


NEW QUESTION # 47
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP Fieldglass
  • B. SAP Hybris
  • C. SAP Ariba
  • D. SAP SuccessFactors
  • E. SAP Concur

Answer: A,C,E


NEW QUESTION # 48
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Material requirements planning
  • B. Forecast planning
  • C. Consumption-based planning
  • D. Manual planning without check

Answer: C


NEW QUESTION # 49
Which mhetods are available for goods issue posting of material components for process orders?

  • A. Picking list
  • B. Transfer order
  • C. Blackflushing
  • D. Kanban

Answer: A,C


NEW QUESTION # 50
You want to use capacity availability checks for production orders. Which settings have to be made for this?

  • A. The PRT Availability Check must be set in the checking control.
  • B. The Relevant for Finite Scheduling indicator must be set
  • C. An overall profile must be assigned in the checking control.
  • D. A checking rule must be assigned in the checking control

Answer: B,C


NEW QUESTION # 51
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

  • A. Use the material where-used report.
  • B. Use batch determination.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D


NEW QUESTION # 52
How can you limit the validity of a bill of material (BOM)?

  • A. By material type
  • B. By plant
  • C. By industry
  • D. By period

Answer: B,D


NEW QUESTION # 53
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Resource network
  • B. Setup matrix
  • C. Work center hierarchy
  • D. Operation network

Answer: C


NEW QUESTION # 54
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Production order release
  • B. Backflushing
  • C. Kanban
  • D. Material requirements planning

Answer: D


NEW QUESTION # 55
What are the consequences if the Dispatched operation status is set for a production order operation?

  • A. You can reschedule the operation using midpoint scheduling in a planning table.
  • B. You can reschedule the operation using finite scheduling in planning table
  • C. You can reschedule the operation using lead time scheduling in a planning table
  • D. You can reschedule the order using infinite scheduling in a planing table

Answer: B,C


NEW QUESTION # 56
For which categories can you define BOMs in SAP S/4HANA?

  • A. Work Center
  • B. Class
  • C. Document Structure
  • D. Sales order

Answer: C,D


NEW QUESTION # 57
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the maximum stock level
  • C. Fill up to the reorder stock level
  • D. Fill up to the safety stoc level

Answer: A


NEW QUESTION # 58
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using quotations for internal and external procurement
  • B. Using stock transfer reservations for stock transfer
  • C. Using purchasing costs for automated source prioritization
  • D. Using run schedule quantities for in-house production
  • E. Using purchase orders for external procurement

Answer: B,D,E


NEW QUESTION # 59
......


SAP C-TS422-2021 exam covers a wide range of topics related to production planning and manufacturing in SAP S/4HANA. These topics include material requirements planning, production orders, capacity planning, shop floor control, and master data management. Candidates are expected to demonstrate their knowledge and skills in these areas through a series of multiple-choice questions.

 

Updated C_TS422_2021 Tests Engine pdf - All Free Dumps Guaranteed: https://www.dumpsfree.com/C_TS422_2021-valid-exam.html

Latest SAP Certified Application Associate C_TS422_2021 Actual Free Exam Questions: https://drive.google.com/open?id=1MbpHD5XOtvfszgmvl3mAzLJqihGi17Tp