
E_S4HCON2023 Dumps Updated Jul 11, 2024 Practice Test and 81 unique questions
2024 Latest 100% Exam Passing Ratio - E_S4HCON2023 Dumps PDF
NEW QUESTION # 11
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the activation
- B. To optimize the migration
- C. To optimize the conversion
- D. To optimize the main import
Answer: B
NEW QUESTION # 12
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. An SAP S4HANA 1709 sandbox system
- B. A Standalone SAP system with ABAP 7.51 or above
- C. AA
Answer: A,B
NEW QUESTION # 13
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
- A. Use the Near Zero Downtime Maintenance Technology (NZDM).
- B. Reuse a profile for the shadow instance from a previous run.
- C. Choose the instance number of the shadow instance.
- D. Keep archiving on during the whole procedure.
Answer: B,C
NEW QUESTION # 14
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Apply the recommendations of the simplification list
- B. Check the compatibility of custom code with SAP S/4HANA
- C. Run the database migration to the SAP HANA database
- D. Perform the migration of data into the new data structure
Answer: A,B
NEW QUESTION # 15
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?
- A. Silent data migration (SDM)
- B. Shadow on target creation
- C. Downtime migration
- D. Downtime conversion
Answer: C
NEW QUESTION # 16
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. MIGRATE J5T_DUR_XML file from a previous run
- B. Breakpoint configuration file SAPUPPHAS.BRK
- C. Stack XML file calculated by the Maintenance Planner
- D. Parameter file SAPup_add.par
Answer: A,C
NEW QUESTION # 17
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. The errors from the SI checks must be solved, otherwise. SUM will report an error
- B. You need to build up an SI check framework by applying SAP Notes
- C. The SI checks are executed in the development system and the results are transported into the subsequent systems
- D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
Answer: B,D
NEW QUESTION # 18
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM continues with the next phase and your modifications are lost
- B. Before continuing with the next phase SUM asks for a modification adjustment transport
- C. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
- D. SUM continues with the next phase and your modifications are kept as In the start release
Answer: D
NEW QUESTION # 19
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
Answer: D
NEW QUESTION # 20
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the corresponding R3trans log files of this phase
- B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- C. In the job log for the corresponding job in SM37 (Job Overview)
- D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
Answer: C,D
NEW QUESTION # 21
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:
- A. Check the dump size of the database export on disk
- B. Check the log files written under "SUM\abap\log"
- C. Check the "Charts Control Center" in the SUM UI
- D. Check logs for jobs starting with "RSUPG_SGEN" in the system
Answer: B,C
NEW QUESTION # 22
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
- A. Support Package Stack update
- B. Database migration
- C. Homogenous system copy
- D. Release upgrade
- E. Dual Stack split
Answer: A,B,D
NEW QUESTION # 23
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. Post-downtime
- B. During SPDD
- C. During downtime
- D. During uptime
Answer: A,D
NEW QUESTION # 24
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. DMO can only be run with systems NW740 or NW731
- B. Target DB size will increase temporarily
- C. A
Answer: A,B
NEW QUESTION # 25
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Unicode conversion
- B. Database migration
- C. Custom code analysis
- D. Software update
Answer: B,D
NEW QUESTION # 26
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. SAP S/4HANA Server 1809 and above
- B. Standalone AS ABAP with SAP_BASIS 752 and above
- C. SAP Solution Manager 7.2
- D. SAP ECC system from SAP ERP 6.0 EHP 8
Answer: A,B
NEW QUESTION # 27
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
- A. It performs a comparison on selected tables using check sum.
- B. It performs a comparison on all tables using row counts.
- C. It does NOT perform any table comparison.
- D. It performs a comparison of all tables using check sum.
Answer: B
NEW QUESTION # 28
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?
- A. The SAP support packages in the download directory that are newer than the selected support package stack
- B. The SAP support packages of the support package stack, calculated by the maintenance planner
- C. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
- D. The SAP support packages that will be bound to the conversion
Answer: A
NEW QUESTION # 29
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Install add-on SAP Gateway 7.50
- B. Delete client 066 (Early Watch Client)
- C. Uninstall industry extensions not supported by SAP S/4HANA
- D. Uninstall Fiori apps not released for SAP_UI 7.50
Answer: B,D
NEW QUESTION # 30
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
- A. Manually activate the adjusted dictionary objects
- B. Assign the transport request as a modification adjustment transport
- C. Release the transport request containing the modification adjustment
- D. Create "modified* versions of the objects that you need to adjust
Answer: B,D
NEW QUESTION # 31
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Migration
- B. Software update
- C. Main import
- D. Conversion
Answer: A,D
NEW QUESTION # 32
......
Verified E_S4HCON2023 dumps Q&As - 100% Pass from DumpsFree: https://www.dumpsfree.com/E_S4HCON2023-valid-exam.html
Pass Exam With Full Sureness - E_S4HCON2023 Dumps with 81 Questions: https://drive.google.com/open?id=1dhUCvLEzsNOObUEOzXo7FcepEPvHh3Be