The CPIM certification is designed for professionals who are involved in the management of production and inventory within their organizations. The certification program is particularly useful for individuals who are looking to advance their careers in operations and supply chain management. The CPIM certification is also beneficial for organizations as it helps them improve their operational efficiency and reduce costs by implementing best practices in production and inventory management. The certification program is recognized globally and provides professionals with the necessary skills and knowledge to effectively manage their organization's production and inventory processes.

 

NEW QUESTION # 21
Which of the following is NOT the manufacturing lead time?

  • A. Load time
  • B. Setup time
  • C. Run time
  • D. Queue time

Answer: A


NEW QUESTION # 22
The service level is directly related to the number of standard deviations provided as safety stock and is usually called:

  • A. safety value
  • B. secure level
  • C. secure stockout
  • D. safety factor

Answer: D


NEW QUESTION # 23
Which of the following are the types of sourcing?

  • A. Group, multiple, single
  • B. Sole, multiple, single
  • C. Sole, Group
  • D. Multiple, single

Answer: B


NEW QUESTION # 24
Altering the load in balancing capacity available means?

  • A. Shifting orders back
  • B. Shifting orders ahead
  • C. Shifting orders ahead or back
  • D. Rescheduling of load sheet

Answer: C


NEW QUESTION # 25
The places where carriers load and unload goods to and from vehicles and make connections between local pickup and delivery service and line-haul service are called:

  • A. Terminals
  • B. Mortals
  • C. Workstations
  • D. None of the above

Answer: A


NEW QUESTION # 26
The movement and storage of goods from suppliers to manufacturing is known as:

  • A. Trading
  • B. Goods Flow
  • C. Distribution
  • D. Physical supply

Answer: D


NEW QUESTION # 27
The art charged by a carrier will also vary with the commodity shipped and will depend upon the following:

  • A. All of these
  • B. Density
  • C. Value
  • D. Perishability

Answer: A


NEW QUESTION # 28
Which one of the following is NOT the part of sales and operations planning benefits?

  • A. It provides a mean of managing change. Rather than reacting to changes in market conditions or the economy after they happen
  • B. Planning ensures the various department plans are realistic, coordinated and support the business plan
  • C. It provides a vague plan that can achieve company objectives
  • D. It provides a mean of updating the strategic business plan as conditions change

Answer: C


NEW QUESTION # 29
The emphasis in just-in-time is on achieving the plan, no more, no less, this is called:

  • A. uniformity
  • B. modularity
  • C. linearity
  • D. consistency

Answer: C


NEW QUESTION # 30
Which combination of business processes is accurate?

  • A. MRP, rough-cut capacity
  • B. MPS, rough cut capacity
  • C. DRP, CRP
  • D. S&OP, CRP

Answer: B


NEW QUESTION # 31
What means doing it right the first time and, if something does go wrong, stopping the process and fixing it?

  • A. All of the above
  • B. Quality at the source
  • C. Process balancing
  • D. Quality assurance

Answer: B


NEW QUESTION # 32
Advantage/s of concurrent engineering is/are:

  • A. All of these
  • B. Time to market is reduced
  • C. Cost is reduced
  • D. Better quality and lower total system cost

Answer: A


NEW QUESTION # 33
The process capability index combines:

  • A. process spread and the tolerance into one index
  • B. process value and the statistical control into one index
  • C. process center and the statistical control into one index
  • D. process shape and the tolerance into one index

Answer: A


NEW QUESTION # 34
All expenses incurred by the firm because of the volume of inventory accepted will fall in:

  • A. All of the above
  • B. Distributed costs
  • C. Carrying costs
  • D. Changing costs

Answer: C


NEW QUESTION # 35
Order quantity is 1000 units and safety stock is 300 units. What is the average inventory?

  • A. 800 units
  • B. 900 units
  • C. 980 units
  • D. 890 units

Answer: A


NEW QUESTION # 36
The orders are automatically scheduled and controlled by the computer are the orders called:

  • A. Planned orders
  • B. Computer generated order
  • C. Firms planned order
  • D. All of the Above

Answer: A


NEW QUESTION # 37
The cost of avoiding trouble by doing the job right in the first place is known as:

  • A. Deterrence cost
  • B. Anticipation cost
  • C. Production cost
  • D. Prevention cost

Answer: D


NEW QUESTION # 38
An SKU costing $10 is ordered in quantities of 500 units, annual demand is 5200 units, carrying costs are 20%, and the cost of placing an order is $50. Calculate annual inventory carrying cost

  • A. $500
  • B. $550
  • C. $400
  • D. $450

Answer: A


NEW QUESTION # 39
As applied to inventories, it is usually found that the relationship between the percentage of items and the percentage of annual dollar usage follows a pattern in which three groups can be defined:
Group A About 50 % of the items account for about 5 % of the dollar usage Group B About 20 % of the items account for about 80 % of the dollar usage Group C About 30 % of the items account for about 15 % of the dollar usage

  • A. False
  • B. True

Answer: A


NEW QUESTION # 40
What is based on a comparative analysis of the introduction and growth of similar products in the hope that the new product behaves in a similar fashion?

  • A. Historical analogy
  • B. Future analogy
  • C. Forecasting analogy
  • D. Estimated analogy

Answer: A


NEW QUESTION # 41
The run time is equal to the run time per piece multiplied by the number of pieces in the order.

  • A. False
  • B. True

Answer: B


NEW QUESTION # 42
A simple system that signals the need for more products is known as:

  • A. Lot-for-more system
  • B. Manifesto system
  • C. Kanban system
  • D. Demanding system

Answer: C


NEW QUESTION # 43
Which one of the following is NOT done by PAC in control phase?

  • A. Track the actual performance of work orders and compare it to planned schedules.
  • B. Ensure that required materials, tooling, personnel and information are available.
  • C. Monitor and control work-in-process, lead times, and work center queues.
  • D. Report work center efficiency, operation times, order quantities and scrap.

Answer: B


NEW QUESTION # 44
......