2022 Updated Verified Pass C-TS422-2020 Exam - Real Questions & Answers [Q82-Q99]

Share

2022 Updated Verified Pass C-TS422-2020 Exam - Real Questions and Answers

Dumps Moneyack Guarantee - C-TS422-2020 Dumps Approved Dumps


SAP C-TS422-2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Outline both motivation and background of SAP S
  • 4HANA
  • Detailed scheduling planning board) and advanced planning
Topic 2
  • Select and apply planning strategies, use the planning table, characterize long-term planning
  • Determine master data objects for process orders
Topic 3
  • Explain and compare the different production methods in make-to-order
  • Determine BOM item category, describe order status management and set user statuses
Topic 4
  • Material Requirements Planning in SAP S
  • 4HANA
  • Describe its main components, the lines of business, and the SAP User Experience strategy
Topic 5
  • Identify and explain production relevant master data
  • Outline best practices for using SAP S
  • 4HANA


SAP C-TS422-2020 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.


C-TS422-2020 Exam Certification Details:

Level:Associate
Cut Score:56%
Sample Questions: SAP C-TS422-2020 Exam Sample Question
Exam:80 questions

 

NEW QUESTION 82
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

  • A. Change of the material'sprocurement type
  • B. Creation of dependent requirements
  • C. Change of the storage bin
  • D. Creation of a sales order
  • E. Creation of a purchasing contract

Answer: A,B,D

 

NEW QUESTION 83
In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Production cost collector
  • C. Repetitive manufacturing profile
  • D. Routing

Answer: A,D

 

NEW QUESTION 84
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.

  • A. Automatic update of story boards
  • B. Real time decision support
  • C. Strategic analysis
  • D. Comparison of current data with historical data to identify trends

Answer: B,C

 

NEW QUESTION 85
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?

  • A. Change the special procurement key of the phantom assembly in the BOM.
  • B. Change the phantom item indicator for the phantom assembly in the BOM.
  • C. Change the item category of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D

 

NEW QUESTION 86
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?

  • A. Delivery date
  • B. Costs
  • C. Quota arrangement
  • D. Component availability
  • E. Vendor rating

Answer: C

 

NEW QUESTION 87
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a resource group.
  • B. Use a heuristic.
  • C. Use a propagation range.
  • D. Use a planning group.

Answer: B

 

NEW QUESTION 88
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a production order.
  • B. It is converted into a schedule line.
  • C. It is converted into a planned order.
  • D. It is converted into a reservation.

Answer: D

 

NEW QUESTION 89
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To reduce the totalproduction lead time for along production line
  • C. To stage different components for a production line simultaneously
  • D. To provide timely updates of inventory management for the staged components

Answer: A,D

 

NEW QUESTION 90
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.

  • A. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
  • B. Manually firm all planned orders for materials within the replenishment lead time of the material
  • C. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
  • D. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material

Answer: A,B

 

NEW QUESTION 91
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.

  • A. Monitor Production Orders Fiori app
  • B. Material Coverage Fiori app
  • C. Flow manufacturing
  • D. Lock-free inventory movements
  • E. Rough-cut capacity planning

Answer: A,B,D

 

NEW QUESTION 92
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.

  • A. MRP Live can propose alternative solutions
  • B. MRP Live can create production orders automatically
  • C. MRP Live can plan materials with recursive BOMs
  • D. MRP Live can priorities demand from sales orders

Answer: A,B

 

NEW QUESTION 93
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Reduction of associated capacity requirements
  • B. Material staging for next order in sequence
  • C. Archiving of documents for assembly scrap
  • D. Posting of production costs to the production cost collector
  • E. Posting of goods receipt for the product

Answer: A,D,E

 

NEW QUESTION 94
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question.

  • A. Use a bucket-oriented capacity check
  • B. Use DS heuristic "Schedule Sequence"
  • C. Use optimization with respect to set-up times
  • D. Use rescheduling with an alternative mode
  • E. Use multilevel MRP run for the products on the resource

Answer: B,C,D

 

NEW QUESTION 95
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.

  • A. Actual cost calculation
  • B. Order type determination
  • C. Planning selection
  • D. Master data selection
  • E. Capacity requirements determination

Answer: B,D,E

 

NEW QUESTION 96
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

  • A. It links receipts from an alternative location in case of a shortage in the default location
  • B. It enables the propagation of network alerts across the bill of materials structure
  • C. It propagates changed sales order priorities to the pegged planned orders
  • D. It replaces fixed pegging relationships unless they have been created for stock

Answer: A

 

NEW QUESTION 97
At the end of the MRP run you receive the exception message "Reschedule In Operation". What caused the message to be generated?

  • A. The requirements date occurs before that of a firmed planned receipt
  • B. The requirements date occurs that of a firmed planned receipt
  • C. The requirement no longer exists
  • D. A firmed planned receipt cannot be rescheduled

Answer: A

 

NEW QUESTION 98
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Make-to-order production (20)
  • C. Make-to-stock production (10)
  • D. Planning without final assembly (50)

Answer: A

 

NEW QUESTION 99
......

Updated PDF (New 2022) Actual SAP C-TS422-2020 Exam Questions: https://www.dumpsfree.com/C-TS422-2020-valid-exam.html